Minerals - IKAV Natural Gas Pipeline Special Use Permit Amendment
Install a 2,788' long, 6" natural gas pipeline adjacent to an existing waterline in a prevously disturbed corridor. Amend existing permit as apprpriate.
Project Summary
Location Summary:
Sauls Creek Area east of Bayfield, CO
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/01/2023 |
Decision | 07/2023 (Estimated) |
Implementation | 10/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3); 32.3 (3)
Special Authority:
Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Lead Management Unit:
Columbine Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology; Special Use Management
Project Activity:
Special Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas
Current Status:
Cancelled
Forests:
San Juan National Forest
Districts:
Columbine Ranger District
States:
Colorado
Counties:
La Plata
Legal Land Description:
T35N R 06W SEC 34
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
James Blair
367 Pearl Street
Bayfield, CO 81122
970-970-385-1372
James.Blair2@usda.gov
Last Updated: 8/15/2023