Minerals - BP Sauls Creek Waterline
BP America proposed to construct a buried 3" waterline to carry produced water from gas wells to an existing waterline. Total length would be about 3000 feet, or 2.1 acres of disturbance.
Project Summary
Location Summary:
Sauls Creek area approximately 5 miles east of Bayfield, Colorado.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/01/2013 |
| Decision | 03/2014 (Estimated) |
| Implementation | 06/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Columbine Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations; Natural Gas
Current Status:
Completed
Project Decision Information
BP Sauls Creek Produced Waterline for the Fischer-Mark Federal B4 Gas Well
Decision Signed Date: 03/31/2014
Forests:
San Juan National Forest
Districts:
Columbine Ranger District
States:
Colorado
Counties:
La Plata
Legal Land Description:
NWNE Section 4, T34N, R6W; and SWSE Section 33, T35N, R6W, NMPM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Walter Brown
367 Pearl Street
Bayfield, CO 81122
970-385-1372
comments-rocky-mountain-san-juan-columbine@fs.fed.us
Last Updated: 3/31/2014