Skip to main content

Minerals - BP Fruitland Coal Gas Horizontal Drilling and Pipeline Re-Authorizations

Re-authorize expiring SUPO and SUP to temporarily expand 3 existing well pads, horizontally drill and hydraulically fracture 6 wells from these 3 pads, and to construct 2 connecting pipelines. <1 acre new long term disturbance. Analysis done in 2017.

Project Summary

Last Updated: 8/31/2018