DTE Fiber Optic Line Extension to Triangle C Ranch
The Shoshone National Forest is proposing to authorize DTE to install approximately 3,760%u2019 or .71 miles of buried fiber optic telecommunications cable from the Historical Tie Hack Monument to the Triangle C Ranch.
Project Summary
Location Summary:
Shoshone National Forest along Highway 26 near the Tie-Hack Historical Monument to the Triangle C Ranch.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/07/2019 |
Decision | 05/2019 (Estimated) |
Implementation | 06/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wind River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
DTE Fiber Optic Line Extension to Triangle C Ranch
Decision Signed Date: 05/24/2019
Forests:
Shoshone National Forest
Districts:
Wind River Ranger District
States:
Wyoming
Counties:
Fremont
Legal Land Description:
T. 43N., R. 109W., Sec. 33 SE1/4 NE1/4; SW1/4 NE1/4; and T. 43N., R. 109w., Sec. 34 SW1/4 NW1/4; SE1/4NW1/4; NE1/4SW1/4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Justin Hawkins
1403 W Ramshorn
Dubois, WY 82513-0186
(307)335-2160
jhawkins@fs.fed.us
Last Updated: 7/24/2019