Skip to main content

Proposed Improvements to Five Hardened Stream Crossings on FR 38 on Santa Catalina Ranger Di

Restore native-surface road/stream crossings to original line and grade by installing a steel pile cutoff wall on downhill side of road within the road right-of-way, sections 15, 16 and 28.

Project Summary

Last Updated: 10/26/2009