TEP Pole Replacement
Authorize TEP to replace two weakened wooden power poles with new 40' metal poles along the north side of Remount Road. Existing poles will be cut below ground level and removed from the site.
Project Summary
Location Summary:
This project is to occur east of the Sabino Canyon Visitor Center along the north side of Remount Road T12S; R15E, portions of section 9.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/01/2017 |
| Decision | 08/2017 (Estimated) |
| Implementation | 08/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Santa Catalina Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
TEP Pole Replacement
Decision Signed Date: 08/15/2017
Forests:
Coronado National Forest
Districts:
Santa Catalina Ranger District
States:
Arizona
Counties:
Pima
Legal Land Description:
T12S, R15E, Portions of Section 9
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christopher Griggs
5700 N. Sabino Canyon Rd
Tuscon, AZ 85750
520-749-7717
christopherlgriggs@fs.fed.us
Last Updated: 9/25/2017