Skip to main content

Arizona Electric Power Cooperative, Inc. Reissuance

Reissuance of a Special Use Permit for operating and maintaining an existing 230kV transmission line with a 75 foot wide right-of-way.

Project Summary

Last Updated: 11/8/2019