Flux Canyon Exploration Drilling

The Project consists of constructing up to 1,940 feet (less than 0.4 miles) of temporary access road and up to 6 drill pads, the use of existing roads, and reclaiming all new temporarily disturbed areas.

Project Summary

Last Updated: 5/30/2023