Skip to main content

Middlemarch Road Realignment

Due to major erosion, approx. 0.11 miles of NFSR 345 needs to be realigned between 1-10 feet from the existing road matrix. Gabion baskets or metal netting would be added to the eroded (NW) side of the road to avoid further damage to the road matrix.

Project Summary

Last Updated: 4/5/2023