Skip to main content

Recreation Residence- Cabin Modifications- Santa Catalina Ranger District

Lot 37 of NR Willow Canyon -Replace existing shingle roof with metal roof green in color. Lot 10 of SR Willow Canyon - Backhoe and heavy equipment will need to be used to dig up the existing leach field/line and replace with a functioning system.

Project Summary

Last Updated: 8/14/2023