Water Transmission Line Permit - Whitetail Ventures LLC Rhem Tunnel
Operation and maintenance of a water pipeline that carries water from the Rhem adit to private property. Current pipeline is constructed of 2.5 inch PVC aboveground approximately 2,500 feet in length with 10 feet wide right of way.
Project Summary
Location Summary:
East Whitetail Canyon, Rhem Tunnel
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/25/2024 |
| Decision | 10/2024 (Estimated) |
| Implementation | 11/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Douglas Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Water Transmission Line Permit - Whitetail Ventures LLC Rhem Tunnel
Decision Signed Date: 10/30/2024
Forests:
Coronado National Forest
Districts:
Douglas Ranger District
States:
Arizona
Counties:
Cochise
Legal Land Description:
T16S, R30E, Sec. 33
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alysa Hansen
3081 N. Leslie Canyon Road
Douglas, AZ 85607
479-964-7277
alysa.hansen@usda.gov
Last Updated: 10/31/2024