Otero County Electric Cooperative Power Line- Cloudcroft to Sunspot
Replace ~12 miles of overhead line with buried line (trench 24? wide and 52? deep). Minimal trees to cut (none over 18" diameter at breast height). Upgrade will better serve customers and provide more reliable, economical, and safe power.
Project Summary
Location Summary:
From Cloudcroft, NM to Sunspot, NM. Route will follow the existing overhead line corridor.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/01/2014 |
Decision | 09/2018 (Estimated) |
Implementation | 11/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sacramento Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Completed
Project Decision Information
Otero County Electric Cooperative Power Line- Cloudcroft to Sunspot
Decision Signed Date: 09/18/2018
Forests:
Lincoln National Forest
Districts:
Sacramento Ranger District
States:
New Mexico
Counties:
Otero
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Marcie Kelton
P.O. Box 288
Cloudcroft, NM 88317
575-682-2551
marciekelton@fs.fed.us
Last Updated: 10/25/2018