Extension of Rio Grande Electrical Cooperative Transmission Line
Extension of Rio Grande Electrical Cooperative transmission line from Hamm well to Shattuck well. This would be an addition of 900 to 1,000 ft to the existing transmission line on Forest Service land. This extension would continue on private land.
Project Summary
Location Summary:
Approximately 1.0 mile west of the junction of State Highway 137 and Forest Service road 540 is the location of Hamm Well. Transmission line will run southeast of Hamm well.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/19/2013 |
| Comment Period | 03/19/2013 |
| Decision | 11/2013 (Estimated) |
| Implementation | 05/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Lead Management Unit:
Guadalupe Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Grazing Management; Special Use Management
Project Activity:
Special Use Authorizations; Grazing Structural Improvements
Current Status:
Completed
Forests:
Lincoln National Forest
Districts:
Guadalupe Ranger District
States:
New Mexico
Counties:
Eddy
Legal Land Description:
Township 25 south; Range 21 east; Sections 3 and 10
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Larry Paul
Federal Bldg., Rm 159
Carlsbad, NM 88220
575-885-4181
lpaul@fs.fed.us
Last Updated: 12/18/2013