Gavilan Canyon Flood Control Project
Village of Ruidoso is proposing to install flood control structures within the Gavilan Canyon drainage on National Forest System lands to control future flooding and debris flow from the McBride Fire burn scar.
Project Summary
Location Summary:
Project located northwest of the intersection of Gavilan Canyon Road and Warrior Drive within the Gavilan Canyon drainage.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/06/2022 |
Decision | 06/2022 (Estimated) |
Implementation | 06/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Smokey Bear Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management; Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Gavilan Canyon Flood Control Project
Decision Signed Date: 06/21/2022
Forests:
Lincoln National Forest
Districts:
Smokey Bear Ranger District
States:
New Mexico
Counties:
Lincoln
Legal Land Description:
SESE, Sec. 14, T. 11 S., R. 13 E.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christina Thompson
901 Mechem Drive
Ruidoso, NM 88345
575-630-3050
christina.thompson@usda.gov
Last Updated: 6/21/2022