Jack's Project
The Project would authorize mining placer deposits from approximately 11 acres for up to 20 years. Mining would be conducted with suction dredges, sluice boxes, dry washers, high bankers, metal detectors, gold pans, and hand tools
Project Summary
Location Summary:
Big Bug Creek, Eugene Gulch,Poland Creek, Crooks Canyon, Wolf Creek, and Copper Basin Wash
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/23/2019 |
Comment Period | 04/05/2020 |
Objection Period Start | 07/2025 (Estimated) |
Decision | 08/2025 (Estimated) |
Implementation | 08/2025 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Prescott National Forest All Units
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
On Hold
Forests:
Prescott National Forest
Districts:
Bradshaw Ranger District
States:
Arizona
Counties:
Yavapai
Legal Land Description:
Sections 23, 24, 26 & 27 T. 12.5 N., R. 1 W; Sections 35 & 36, T. 13 N., R. 1 W; Section 24 T. 12 N., R. 1 W; Section 36 T. 12 N., R. 2 W; Section 29 T. 13 N., R 3 W; Section 1 T. 10 N., R. 1 E GSRM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Zakiya Shivji
344 So. Cortez St.
Prescott, AZ 86303
928-443-8083
zshivji@fs.fed.us
Last Updated: 7/8/2024