Bronco Creek Exploration Inc. Copper Basin Exploration Project
Exploration drilling for copper and molybdenum to be conducted south of Crown King. Up to drill 6 pads will be used out of 35 possible sites. Multiple drill holes may be drilled at each drill pad. No more than 5 holes may be open at one time.
Project Summary
Location Summary:
At or near Lane Mountain within the Bradshaw Mountains. South of Crown King, AZ
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/08/2012 |
Comment Period | 05/09/2012 |
Decision | 07/2012 (Estimated) |
Implementation | 09/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bradshaw Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Bronco Creek Inc. Copper Basin Exploration Project
Decision Signed Date: 07/11/2012
Legal Notice Date: 07/15/2012
Forests:
Prescott National Forest
Districts:
Bradshaw Ranger District
States:
Arizona
Counties:
Yavapai
Legal Land Description:
T9N, R1W, Sections 2, 10, 11 & 12 and T10N R1W, Section 36
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Frances Alvarado
344 South Cortez Street
Prescott, AZ 86303-4398
928-443-8014
falvarado@fs.fed.us
Last Updated: 7/16/2012