Skip to main content

Jemez Mountain Electric Cooperative, Inc. (JMEC) Master Permit Reauthorization

JMEC is requesting a reauthorization of their master permit to maintain and operate approximately 349.49 acres of electrical lines (266.2 acres of distribution lines, 30.87 acres of buried distribution lines and 52.42 acres of overhead transmission lines), total of 133.355 miles, across NFS lands.

Project Summary

Last Updated: 12/30/2025