Skip to main content

Rio Grande Corridor at Buckman Restoration and Recreation Enhancement Project

Restoration of riparian areas and recreation enhancements within the Rio Grande Corridor at Buckman. There are two areas identified for restoration, one within Diablo Canyon (BLM lands) and one large area along the east bank of the Rio Grande near the BDD facility (USFS and BLM lands). There are two areas identified for recreation enhancements, one area on the west side of Diablo Canyon (BLM lands) and one area along the Rio Grande adjacent to the BDD facility (USFS lands).

Project Summary

Last Updated: 11/20/2012