Abiquiu Land Grant Water Line Replacement Project
In 1967, the Merced de Abiquiu (Land Grant), installed a water collection gallery and water line on National Forest System lands in order to provide water for livestock. This facility is at the end of its life and the proposal is to replace it.
Project Summary
Location Summary:
The project is located south of the Merced de Abiquiu, running from the grant boundary approximately 1.5 miles to Vallecitos Creek.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/12/2015 |
Decision | 02/2017 (Estimated) |
Implementation | 02/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Espanola Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Facility Maintenance
Current Status:
Completed
Project Decision Information
Abiquiu Land Grant Water Line Replacement Project
Decision Signed Date: 02/22/2017
Forests:
Santa Fe National Forest
Districts:
Espanola Ranger District
States:
New Mexico
Counties:
Rio Arriba
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Anne Baldwin
1710 North Riverside Drive
Espanola, NM 87532
505-753-7331
arbaldwin@fs.fed.us