Dalton Day Use River Restoration Project
The proposed project will improve water quality and fish habitat be restoring the river channel to a more natural condition, reducing turbidity, attenuating flow energy during future flooding, and reducing downstream water temperatures.
Project Summary
Location Summary:
Project area is along the Pecos River at the south end of the Santa Fe National Forest Dalton Say Use Area in Pecos Canyon.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/10/2015 |
Decision | 02/2016 (Estimated) |
Implementation | 04/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pecos-Las Vegas Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management; Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Dalton Day Use River Restoration Project
Decision Signed Date: 02/22/2016
Forests:
Santa Fe National Forest
Districts:
Pecos-Las Vegas Ranger District
States:
New Mexico
Counties:
San Miguel
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alberta Maez
P.O. Drawer 429
Pecos, NM 8752-0429
505-425-3534
amaez@fs.fed.us
Last Updated: 3/3/2016