Medio Fire Restoration: Post Fire Rehabilitation
Install in-stream structures such as one-rock dams and log vanes in Rio en Medio and four small tributaries that were impacted by the Medio Fire. Intent is to create conditions to reduce likelihood of head cutting, channel degradation and soil loss.
Project Summary
Location Summary:
About 14 miles north of downtown Santa Fe in the Rio en Medio drainage.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/16/2021 |
Decision | 05/2021 (Estimated) |
Implementation | 05/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (11), 36 Cfr 220.6(E)(11)
Special Authority:
National Fire Plan - Healthy Forests Initiative Ce
Lead Management Unit:
Espanola Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Medio Fire Restoration: Post Fire Rehabilitation
Decision Signed Date: 05/25/2021
Forests:
Santa Fe National Forest
Districts:
Espanola Ranger District
States:
New Mexico
Counties:
Santa Fe
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sandy Hurlocker
1710 North Riverside Drive
Espanola, NM 87532
505-753-7331
shurlocker@fs.fed.us
Last Updated: 9/10/2021