Bull and Jim Claims Uranium Drilling Exploration
Conduct exploratory drilling to assess the potential presence and depth of uranium ore deposits on both the Bull and Jim Claims. Bull: Drill one to five holes at one pad/site. Jim: Drill five holes at three different pads/sites.
Project Summary
Location Summary:
Bull Claims are located within the Tonto Basin RD. Jim Claims are within the Pleasant Valley RD.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/27/2009 |
| Decision | 09/2011 (Estimated) |
| Implementation | 10/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tonto Basin Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Forest Products; Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Road Improvements/Construction
Current Status:
Cancelled
Forests:
Tonto National Forest
Districts:
Pleasant Valley Ranger District; Tonto Basin Ranger District
States:
Arizona
Counties:
Gila
Legal Land Description:
Bull Claims: T5N, R15E, S19. Jim Claims: T5N, R14E, S31, and T5N, R13E, S25.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Karyn Harbour
Hwy. 88, HC 02, Box 4800
Roosevelt, AZ 85545
602-225-5272
kharbour@fs.fed.us
Last Updated: 3/8/2012