Hitching Rock Water System
Use two existing wells to supply water to 10 storage tanks (2500-10000 gal) and 10 troughs to provide water for livestock, wildlife, fire suppression. Approx. 4 miles of poly pipe will be placed above ground to link wells to tanks and troughs.
Project Summary
Location Summary:
wells are adjacent to Forest Road 406 on the Payson Ranger District; water system is southwest of Snowstorm Mountain
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/30/2009 |
Decision | 05/2010 (Estimated) |
Implementation | 07/2010 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (9), 36 Cfr 220.6(E)(9)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Payson Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Current Status:
Completed
Project Decision Information
Hitching Rock Water System Project
Decision Signed Date: 05/25/2010
Forests:
Tonto National Forest
Districts:
Payson Ranger District
States:
Arizona
Counties:
Gila
Legal Land Description:
T 10N, R 19E, Sections 11, 13, 14, 23, 24
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Chris Thiel
1009 E. Highway 260
Payson, AZ 85541
928-474-7900
cathiel@fs.fed.us
Last Updated: 6/2/2010