Connor Canyon Mineral Material Source
The Arizona Department of Transportation has proposed to resume use of the existing 4.5 acre mineral material pit, of which 2.5 acres has previously been excavated. Material would be used for maintenance of SR 288 between Reynolds Creek and Young.
Project Summary
Location Summary:
The pit is located approximately 20 miles south of the community of Young along State Route 288, milepost 280.8.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 01/14/2015 |
| Decision | 05/2015 (Estimated) |
| Implementation | 08/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pleasant Valley Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Connor Canyon Mineral Material Source
Decision Signed Date: 05/01/2015
Forests:
Tonto National Forest
Districts:
Pleasant Valley Ranger District
States:
Arizona
Counties:
Gila
Legal Land Description:
Township 6 North, Range 13 East, Section 36, Gila and Salt River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Judd Sampson
1009 E. Highway 260
Payson, AZ 85541
6022255272
juddsampson@fs.fed.us
Last Updated: 12/10/2019