Copper King Exploratory Drilling
Bronco Creek Exploration proposes to drill a maximum of 18 drill sites from 27 possible drill site locations over a period of ten years.
Project Summary
Location Summary:
Approximately two miles northeast of the Town of Superior. Township 1 South, Range 12 E, Sections 10-15, and 22-24; Township 1 South, Range 13 E, Section 7, 8, 17, and 18.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/2018 (Estimated) |
Comment Period | 12/2018 (Estimated) |
Objection Period Start | 06/2019 (Estimated) |
Decision | 09/2019 (Estimated) |
Implementation | 10/2019 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Globe Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Cancelled
Forests:
Tonto National Forest
Districts:
Globe Ranger District
States:
Arizona
Counties:
Pinal
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Benjamin Harrold
768 S. Sixshooter Canoyon Rd.
Globe, AZ 85501
928-402-6200
comments-southwestern-tonto-globe@fs.fed.us
Last Updated: 6/8/2018