Skip to main content

Antenna Sites Pinal Peak #27 improvement

a new prefab building replacing the existing, a new ice bridge with supports, a new generator and fuel tank on new slabs, trenching between the tank, generator, and building, and a new electrical trench from the building to APS transformer.

Project Summary

Last Updated: 10/16/2019