State Route 88 (Apache Trail) Road Repair Project
The purpose of this project is to authorize ADOT to repair and mitigate damage to approximately one and a half miles of SR 88 to allow the roadway to be reopened by ADOT to four-wheel drive, high-clearance vehicles, and UTVs.
Project Summary
Location Summary:
Along State Route 88 (also known as the Apache Trail), the project begins at milepost 222.0 (Fish Creek Overlook) and extends approximately one and a half miles to milepost 223.5 (Fish Creek Bridge).
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/31/2024 |
| Decision | 07/2024 (Estimated) |
| Implementation | 07/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (23), 36 Cfr 220.6(E)(23)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mesa Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Decision Memo for the State Route 88 (Apache Trail) Road Repair Project
Decision Signed Date: 07/18/2024
Forests:
Tonto National Forest
Districts:
Mesa Ranger District
States:
Arizona
Counties:
Maricopa
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Devin Quintana
5140 E. Ingram St.
Mesa, AZ 85205
602-225-5223
comments-southwestern-tonto-mesa@usda.gov
Last Updated: 7/18/2024