Skip to main content

UDMT Project 1.A1 Oaks Park Pipeline Rehab

A new flow meter, along with associated telemetry, would be installed on the new 42-inch high-density polyethylene (HDPE) pipeline below the Oaks Park Dam.

Project Summary

Last Updated: 9/9/2026