Skip to main content

UDMT Project 1.J4 Farnsworth Canal Heading Communication Improvements

Replacement of existing telemetry and radio equipment at the downstream metal flume to provide consistent communication as well as installation of a level sensor and radial gate opening measurement at the concrete diversion structure at the Lake Fork River for measurement of river/return flows.

Project Summary

Last Updated: 9/9/2026