Revised Duchesne Roosevelt District Wide Range Improvement Project
The Ashley NF proposes to modify the Sowers Canyon portion of the Duchesne Roosevelt District Wide Range Improvement Project. The project includes an additional 4 miles pipeline, 5 additional trough locations and two 10,000 gal storage tanks.
Project Summary
Current Status:
Completed
Location Summary:
The project location is approximately 25 miles Southwest of Duchesne, Utah
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/16/2019 |
| Comment Period | 07/16/2019 |
| Objection Period Start | 09/03/2019 |
| Decision | 10/2019 (Estimated) |
| Implementation | 10/2019 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Roosevelt Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Project Decision Information
Revised Duchesne Roosevelt District Wide Range Improvement Project
Decision Signed Date: 10/28/2019
Forests:
Ashley National Forest
Districts:
Roosevelt Ranger District
States:
Utah
Counties:
Duchesne
Legal Land Description:
Sections 24, 25, 26, 27, 29, 32, 33, 35 T 6 S, R 6 W, Salt Lake Base Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Todd Irish
650 W. Highway 40
Roosevelt, UT 84066
435-781-5205
todd.irish@usda.gov
Last Updated: 11/8/2019