Mosby Mountain Pipeline
This project would involve the construction of a pipeline from Mosby Canal to the lower pastures of Mosby Mountain Allotment to provide a reliable water source for cattle.
Project Summary
Location Summary:
Mosby Mountain-23 miles north of Lapoint, Utah on Mosby Mountain Road
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/13/2013 |
Comment Period | 10/2014 (Estimated) |
Objection Period Start | 12/2014 (Estimated) |
Decision | 02/2015 (Estimated) |
Implementation | 05/2015 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Vernal Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Grazing Management
Project Activity:
Grazing Structural Improvements
Current Status:
Cancelled
Forests:
Ashley National Forest
Districts:
Vernal Ranger District
States:
Utah
Counties:
Uintah
Legal Land Description:
Salt Lake Meridian T2S, R18E, Sec 22, 27, 34, 35; T3S, R18E, Sec 2, 10, 11 Uintah Meridian T2N, R1E Sec 9, 16
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Garry Brown
355 North Vernal Ave
Vernal, UT 84078
435-781-5168
gdbrown@fs.fed.us