Skip to main content

Bureau of Indian Affairs (BIA) Big Springs Road Paving Project

There are approximately 0.38 miles of unpaved road that would be paved with asphalt. The existing road width is about 18 feet. The proposed project would increase the road width to 22 feet and the total right of way would be 60 feet.

Project Summary

Last Updated: 4/16/2014