Honeycomb Mine
A new Plan of Operations was submitted for continued operations at the Honeycomb Mine. Large blocks of decorative calcite will be removed from the mine. Up to 2.5 acres active disturbance proposed. Disturbed areas not needed would be reclaimed.
Project Summary
Location Summary:
The Honeycomb Mine is within the Blind Stream drainage of the Duchesne District of the Ashley NF. At the end of Forest System road 121, in the North 1/2 of Section 28, T2N R8W, Uinta Meridian.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/19/2015 |
Comment Period | 12/08/2015 |
Objection Period Start | 02/02/2016 |
Decision | 05/2016 (Estimated) |
Implementation | 06/2016 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Duchesne Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Honeycomb Mine Project
Decision Signed Date: 05/11/2016
Forests:
Ashley National Forest
Districts:
Duchesne Ranger District
States:
Utah
Counties:
Duchesne
Legal Land Description:
Mine located within North 1/2 of Section 28, T2N R8W, Uinta Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Herron
85 West Main
Duchesne, Ut 84021
435-781-5218
daherron@fs.fed.us
Last Updated: 8/9/2018