Dal Cuinn Drilling
The proponent has submitted a plan of operations for exploratory drilling for locatable minerals in the Dry Ridge area of the Ashley NF. The plan includes drilling two holes, each up to 600 feet deep, within existing mining claims.
Project Summary
Location Summary:
The project is located within the Dry Ridge area, with both proposed drill-holes to be located in section 8 of T2N R6W, Uinta Meridian.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/25/2021 |
Decision | 10/2021 (Estimated) |
Implementation | 10/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Duchesne Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Dal Cuinn Drilling
Decision Signed Date: 10/01/2021
Forests:
Ashley National Forest
Districts:
Duchesne Ranger District
States:
Utah
Counties:
Duchesne
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Herron
85 West Main
Duchesne, Ut 84021
435-781-5218
david.herron@usda.gov
Last Updated: 10/4/2021