Riparian Health and Resiliency Infrastructure
The goal of the project is to install fencing around six riparian areas to force livestock to disperse, establish the ability to graze the fenced areas in a more controlled manner, and over time improve riparian health.
Project Summary
Location Summary:
Various riparian corridors throughout the District. See attached maps.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/16/2024 |
Decision | 05/2025 (Estimated) |
Implementation | 07/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (25), 36 Cfr 220.6(E)(25)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pine Valley Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants; Grazing Management; Watershed Management
Project Activity:
Species Habitat Improvements; Grazing Structural Improvements; Watershed Improvements
Current Status:
In Progress
Forests:
Dixie National Forest
Districts:
Pine Valley Ranger District
States:
Utah
Counties:
Iron; Washington
Legal Land Description:
Several located throughout the District, see maps.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Hannah Schramm
196 E. Tabernacle, Suite 40
St. George, UT 84770
209-295-5930
Hannah.Schramm@usda.gov
Last Updated: 4/14/2025