Garkane Energy Barney Top Power Line Realignment and Burial, Phase II

Garkane Energy proposes to install up to 13600 feet of single-phase 7200-volt underground power line with a 20 foot easement to a depth of 42 inches along Forest Road 132. This proposal includes removing 14650 feet of existing overhead power line.

Project Summary

Last Updated: 9/17/2016