South Central Utah Telephone Association (SCUTA) Panguitch Lake North project
The project would bury 1.7 miles of single, non-electric fiber optic cable in duct conduits in a 10 foot (2.1 acres) Right of Way and 15 foot (3.1 acres) construction Right of Way, 1.2 acres and 1.7 acres of which are on Forest Service lands.
Project Summary
Location Summary:
Township 35S Range 7W Sections 32 and 33 and Township 36S Range 7W Section 6
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 12/07/2023 |
| Decision | 08/2024 (Estimated) |
| Implementation | 09/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Cedar City Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
South Central Utah Telephone Association (SCUTA) Panguitch Lake North project
Decision Signed Date: 08/13/2024
Forests:
Dixie National Forest
Districts:
Cedar City Ranger District
States:
Utah
Counties:
Kane
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michael Golden
1789 North Wedgewood Lane
Cedar City, UT 84721-7769
435-865-3221
michael.golden@usda.gov
Last Updated: 8/16/2024