Polaris Exploration Project
Project consists of the temporary construction of up to 25 miles of new and/or reconstruction of previously reclaimed roads; construction of 250 drill sites; exploration drilling activities, and reclamation of all proposed disturbances.
Project Summary
Location Summary:
Located 18 miles south-southwest of Hawthorne, Nevada.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/18/2024 |
Comment Period | 01/18/2024 |
Objection Period Start | 07/18/2025 |
Decision | 11/2025 (Estimated) |
Implementation | 04/2026 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bridgeport Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
In Progress
Forests:
Humboldt-Toiyabe National Forest
Districts:
Bridgeport Ranger District
States:
Nevada
Counties:
Mineral
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Alana Basso
HC 62 Box 1000
Bridgeport, CA 93517
775-778-6129
Alana.Basso@usda.gov
Last Updated: 7/18/2025