Sonora Bridge River Crossing MCMWTC
Set six posts (three on each side of river) as anchors for high tension rope crossing. By installing the poles the trees will no longer be utilized. These poles will be buried 4'into and incased in concrete for stability and long term use.
Project Summary
Location Summary:
HIGHWAY 108, T6N R23E, SEC 17 NW NW SW
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/08/2018 |
Decision | 03/2018 (Estimated) |
Implementation | 03/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Humboldt-Toiyabe National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Sonora Bridge River Crossing MCMWTC
Decision Signed Date: 03/12/2018
Forests:
Humboldt-Toiyabe National Forest
Districts:
Bridgeport Ranger District
States:
California
Counties:
Mono
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Eric Dillingham
1200 Franklin Way
Sparks, NV 89431
505-434-7276
edillingham@fs.fed.us
Last Updated: 3/13/2018