Pickel Meadow Restoration Project
The Pickel Meadow restoration project will reactivate the alluvial fan at the upstream end of the meadow, repair a diversion structure within the meadow, and improve aquatic habitat within the West Walker River.
Project Summary
Location Summary:
Pickel Meadow is located along the West Walker River in Mono County on the Bridgeport Ranger District. Pickel Meadow can be accessed by HWY 108 (Sonora Pass) and is near the Marine Mountain Warfare Training Center.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/15/2024 |
Decision | 12/2024 (Estimated) |
Implementation | 10/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Humboldt-Toiyabe National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Pickel Meadow Restoration Project
Decision Signed Date: 12/17/2024
Forests:
Humboldt-Toiyabe National Forest
Districts:
Bridgeport Ranger District
States:
California
Counties:
Mono
Legal Land Description:
T06N , R22E, Sec(s) 23,24,26
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kayla Smith
1200 Franklin Way
Sparks, NV 89431
000-000-0000
Kayla.Smith2@usda.gov
Last Updated: 1/24/2025