Cedar Hollow Big Spring Waterline Phase 2

The Big Springs Phase 2 Waterline range improvement will connect to Phase 1 (decision memo signed in June 2020) and continue poly pipe for approximately 2.5 miles. Four troughs will be installed along with two, 5,000 gallon water storage tanks.

Project Summary

Last Updated: 8/3/2020