Caples Lake Snowmaking Line Replacement at Kirkwood Mountain Resort
The project would replace approximately 2.2 miles (11,402 linear feet) of existing steel water line used to supply Kirkwood Mountain Resort with water for on-mountain snowmaking from Caples Lake to Chair 1.
Project Summary
Location Summary:
The existing line lies between Caples Lake and Chair 1 of Kirkwood Mountain Resort, on the Amador Ranger District of the Eldorado National Forest, in Amador County, California.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/10/2023 |
Decision | 08/2025 (Estimated) |
Implementation | 08/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Amador Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Developed Site Management; Facility Improvements/Construction; Special Use Authorizations
Current Status:
In Progress
Forests:
Eldorado National Forest
Districts:
Amador Ranger District
States:
California
Counties:
Amador
Legal Land Description:
Township 9 & 10N Range 17 & 18E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Cecilia Reed
26820 Silver Drive
Pioneer, CA 95666
425-888-8769
cecilia.reed@usda.gov
Last Updated: 6/3/2025