Kirkwood Meadows Power Line Reliability
Connect Kirkwood Meadows Public Utility District to the PG&E power grid at Salt Springs powerhouse & transmit power to the Kirkwood PUD ratepayers to replace desiel engine generators currently in use.
Project Summary
Location Summary:
From Bear River Reservoir to Kirkwood Meadows
Project Milestones:
| Milestone | Date |
|---|---|
| NOI in Federal Register | 02/27/2009 |
| DEIS NOA in Federal Register | 04/01/2011 |
| FEIS NOA in Federal Register | 03/20/2012 |
| Decision | 03/2012 (Estimated) |
| Implementation | 06/2012 (Estimated) |
Expected Analysis Type:
Environmental Impact Statement
Special Authority:
Not Applicable / Other
Lead Management Unit:
Amador Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Kirkwood Meadows power Line Reliability
Decision Signed Date: 03/12/2012
Legal Notice Date: 03/14/2012
Forests:
Eldorado National Forest
Districts:
Amador Ranger District
States:
California
Counties:
Alpine; Amador; El Dorado
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sue Rodman
26820 Silver Drive
Pioneer, CA 95666
530-621-5298
srodman@fs.fed.us
Last Updated: 3/20/2012