Barrett Lake 4wd Trail Reconstruction
Reconstruct three segments of the Barrett Lake 4wd Ttrail that cross meadows. Two segments would be reconstructed in place and one segment would be replaced by a reroute .27 miles in length, with the original trail segment to be restored.
Project Summary
Location Summary:
Barrett Lake 4WD Trail
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/13/2013 |
Comment Period | 03/07/2014 |
Objection Period Start | 04/25/2014 |
Decision | 06/2014 (Estimated) |
Implementation | 07/2014 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Eldorado National Forest All Units
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Road Management
Project Activity:
Road Maintenance; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Barrett Lake 4wd Trail Reconstruction
Decision Signed Date: 06/16/2014
Legal Notice Date: 06/16/2014
Forests:
Eldorado National Forest
Districts:
Pacific Ranger District
States:
California
Counties:
El Dorado
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Diana Erickson
100 Forni Road
Placerville, CA 95667
530-621-5214
dkerickson@fs.fed.us
Last Updated: 6/30/2014