2026 BNK TVA Transmission Lines and Fiber Line

Tennessee Valley Authority has proposed to install a new section of transmission power line (0.26 miles on NFS land), renew an expired authorization for a transmission line (14.58 miles on NFS land), and add an additional pole and fiber optic cable to the existing transmission line on Bankhead.

Project Summary

Last Updated: 7/15/2026