Federal Aviation Administration Black Warrior Central Tower
A fixed Aircraft transponder (beacon parrot), two antennas and power distribution panel within the equipment room shed, ground plate lightning surge arrestor located on the central fire tower.
Project Summary
Current Status:
Completed
Location Summary:
Central Fire Tower at Black Warrior Work Center off Alabama Hwy 33
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 12/02/2020 |
| Decision | 06/2021 (Estimated) |
| Implementation | 06/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Bankhead Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Special Use Permit for US DOT, Federal Aviation Administration, Bankhead NF
Decision Signed Date: 06/18/2021
Forests:
National Forests in Alabama
Districts:
Bankhead Ranger District
States:
Alabama
Counties:
Lawrence
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Shane Hoskins
P.O. Box 278
Double Springs, AL 35553
205-489-5111
shaneahoskins@fs.fed.us
Last Updated: 10/26/2022