Skip to main content

Columbia Gas of Virginia Glasgow and VAM-1 Pipeline Replacement

Project proposes to replace approximately 10 miles of existing gas pipelines which were installed between the 1930s and 1950s and have reached the end of their serviceable life. The pipeline replacement would include an existing crossing of the Appalachian National Scenic Trail.

Project Summary

Last Updated: 6/4/2026