Skip to main content

Plan Amendment for the George Washington NF LRMP for Rx5C Reallocation for Atlantic Coast Pipeline.

If FS authorizes ACP pipeline and issues a special use permit, the new utility corridor must be reallocated to Rx5C-Designated Utility Corridors. The GWNF is no longer proposing this amendment for the ACP Project.

Project Summary

Last Updated: 7/18/2017