Skip to main content

Grayson County Fiber Optic Install - Volney to Fairwood Section

Appalachian Electric Power will install new fiber-optic cable in the existing 40-foot wide right-of-way. Total length is approximately 1,950 feet, and will use up to eight existing poles.

Project Summary

Last Updated: 10/4/2021