Skip to main content

Camp Shelby South Tank Trail Realignment and Maintenance

Realign and reconstruct portions of the South Tank Trail adjacent to Range 49, Range 13, and Range 14 straighten blind S curves, reduce steep grades, replace culverts and redirect erosion control structures to improve drainage

Project Summary

Last Updated: 6/7/2019